How long does it take to create a business website?

· 4 min read

A simple website can be delivered in a few days. A complete project usually takes one to two weeks after content is received. The timeline mainly depends on approvals and content.

What is a realistic timeline?

Indicatively: a few days for an essential site, one to two weeks for a professional business site. The actual timeline depends on the number of review rounds and the availability of your text and photos.

What shortens or extends the timeline

Most delays come from content, not development.

  • Content ready and approved quickly: shorter timeline.
  • Multiple design review rounds: longer timeline.
  • Specific features: to be scoped and scheduled.
  • A single decision-maker on the client side: significant time saved.

An honest schedule

We give a range, not an absolute guarantee. A schedule is confirmed after scoping, once the perimeter is known. Anything outside that perimeter is covered by a separate quote.